Dada Gorgud

Fleet Specification

Dada Gorgud

Semi - Submersible Drilling Rig



General Description   


Design Friede & Goldman Pacesetter Series 9500  
Built/Yard  1978 by Blocks / Rauma - Repola, Finland
Assembled/Yard  August 1981/ Astrakhan, Russia
Upgraded/Yard  2015 / BSY, Baku, Azerbaijan
Dimensions 216 ft. x 202 ft.
Normal operating draft 45 ft. 
Towing Draft 19 ft. 
Maximum variable load (drilling) 1865 mt  
Quarters capacity 120 persons  
Operating water depth (as outfitted)  1,557 ft.  
Operating water depth (design)  1,557 ft.  

Drilling Equipment

Derrick 160 ft. x 40ft x 18 ft. Skytop Brewster, with a static hook load capacity of 1,300,000 lbs. with 14 lines, 1,023,000 lbs. with 12 lines (1-1/2 in. drilling line).
Drawworks National 1625-DE, powered by 2 Hi-Torque GE 752 motors complete with Baylor 7838 auxiliary brake.
Rotary table National C-495, 800 short tons, independent drive, GE 752 through 2¬speed gear box.
Top Drayv MH DDM-650L-DC, 650 st, with GE 752 Hi-Torque DC motor. Rated at 50,400 ft./lbs. @ 120 rpm in low gear - 17,687 ft./lbs. @ 237 rpm in high gear. Maritime Hydraulics Pipehandler.
Pipe handling BJ type V-3A racking system comprising of upper and intermediate racking arms with lower arm manipulator.
Motion compensator Shaffer 600k – 18 ft. stroke
Mud Pumps Three National 12-P-160, 1,600 hp, driver by 2 each GE-752 motors.
Solids Control Four Axiom AX-1 shale Two Derrick FLS 200-28/258 scalpers.

  

Storage Capacities 

Liquid Mud 2,400 bbls. including process pits
Base oil 2,000 bbls.
Brine or Mud 2,000 bbls.
Bulk Mud 10,260 cu. ft. 6 silos

 Power Equipment

DC 10RIFAS (4 x 888kW & 6 x 705kW)
AC Four Wartsila 8L26F engines each developing 3648hp at 1000rpm, driving Alconza HNR 6376A-6LW , 2642kW at 1000rpm

Subsea Equipment

Riser 1,575 ft. of Vetco MR6C, 21”, 5/8” wall thickness riser.
Tensioners 8 x Shaffer, 80 kips, riser tensioner with 50 ft. stroke. Six Shaffer guide/pod line tensioners, 16 kips by 50 ft. stroke.

 BOP Equipment

Diverter System Regan KFDS, 49.5” with two 14” discharge lines & single remotely operated selector valve.
18-3/4 in. System Two Shaffer 5M SXF annular preventers, two Shaffer 10M SL double ram preveters with Ultralock II.
Cranes Two National OS-435 and one National OS-105.

Mooring  System

Chain 8 x 1125m, 2.75 inch
Anchors 8 x 12MT Stevpris Mk6
Winches 8 x National D521-E winches, capable of 261 tons max pull.

 

The Drilling History of Dada Gorgud
 
Blok Well(s) Client Date of completion
Guneshli/Chirag/Azeri GCA №1 AIOC 24 Dekabr 1996
Guneshli/Chirag/Azəri GCA №2 AIOC 05 Aprel 1997
Guneshli/Chirag/Azeri GCA №3 AIOC 10 May 1997
Guneshli/Chirag/Azeri GCA №4 AIOC 04 August 1997
Garabakh KPS №1 CIPCO 30 November 1997
Ashrafi Ashrafi №1 NAOC 08 Fevral 1997
Garabakh KPS №2 CIPCO 01 July 1998
Shakh Deniz SDX №1 AIOC 09 August 1998
Dan Ulduzu Dan Ulduzu №1 NAOC 19 September 1998
Garabakh KPS №3 CIPCO 18 November 1998
Guneshli/Chirag/Azeri GCA №5/5z AIOC 05 February 1999
Dan Ulduzu DU №2 NAOC 08 March 1999
Shakh Deniz SDX-1 AIOC 05 July 1999
Guneshli/Chirag/Azeri GCA №6y AIOC 01 Avgust 2000
İnam INX-1 AIOC 29 Aprel 2001
Kurdashı KD №1X DIR Agip Azerbaijan 25 August 2001
Central Azeri B007 AIOC 19 February 2002
Central Azeri ACG-B-001 AIOC 28 May 2002
Central Azeri B002 AIOC 22 September 2002
Central Azeri B002z AIOC 03 October 2002
Central Azeri B003 AIOC 31 October 2002
Central Azeri B004 AIOC 26 November 2002
Central Azeri B005 AIOC 24 December 2002
Central Azeri B006 AIOC 06 February 2003
Central Azeri B008 AIOC 06 Macht 2003
Central Azeri B009 AIOC 20 March 2003
West Azeri West Azeri Trial 1 AIOC 22 December 2003
East Azeri D-01 AIOC 08 Aprel 2004
East Azeri D-02 AIOC 03 May 2004
East Azeri D-03 AIOC 24 May 2004
East Azeri D-04 AIOC 27 Jun 2004
West Azeri C-01- AIOC 27 August 2004
West Azeri C-01-Z AIOC 08 September 2004
West Azeri C-03 AIOC 05 October 2004
West Azeri C-03-ST-1 AIOC 23 October 2004
West Azeri C-03-Z AIOC 06 November 2004
West Azeri C-04 AIOC 7 January 2005
West Azeri C-01AZ AIOC 11 Fevral 2005
West Azeri C-05 AIOC 16 March 2005
West Azeri C-05-Z AIOC 31 March 2005
West Azeri C-03-Z AIOC 6 May 2005
East Azeri D-01-Y AIOC 15 İyun 2005
East Azeri D-03 AIOC 15 July 2005
East Azeri D-05 AIOC 26 August 2005
East Azeri D-05z AIOC 03 September 2005
East Azeri D-06 AIOC 26 September 2005
East Azeri D-07 AIOC 26 October 2005
East Azeri D-08 (CRI) AIOC 28 December 2005
Deepwater Guneshli E-01 AIOC 10 Fevral 2006
Deepwater Guneshli E-01Z AIOC 27 March 2006
Deepwater Guneshli E-01Z AIOC 28 Aprel 2006
North Deepwater Guneshli F-01 AIOC 07 May 2006
Deepwater Guneshli G-01 AIOC 10 Jun 2006
Deepwater Guneshli E-02 AIOC 11 September 2006
Deepwater Guneshli G-01 AIOC 6 October 2006
Deepwater Guneshli E-02Y  AIOC 07 October 2006
Deepwater Guneshli E-02 AIOC 17 October 2006
Deepwater Guneshli E-01Y AIOC 18 October 2006
Deepwater Guneshli E-01Y AIOC 22 October 2006
Deepwater Guneshli E-03 AIOC 09 November 2006
Deepwater Guneshli E-03 AIOC 15 Noyabr 2006
Deepwater Guneshli E-04 AIOC 17 December 2006
Deepwater Guneshli E-05 AIOC 11 January 2007
Deepwater Guneshli E-06 AIOC 02 Fevral 2007
Deepwater Guneshli E-09 AIOC 23 Mart 2007
Deepwater Guneshli E-07 AIOC 03 Aprel 2007
Deepwater Guneshli E-08 AIOC 04 Aprel 2007
Deepwater Guneshli E-10 AIOC 04 Jun 2007
South Deepwater Gunesh G-03 AIOC 8 July 2007
South Deepwater Gunesh G-02 Z side track AIOC 29 September 2007
Deepwater Guneshli E-05 AIOC 01 October 2007
South Deepwater Guneshli G-01Z/G01Y AIOC 30 October 2007
North Deepwater Guneshli F-03 AIOC 3 March 2008
North Deepwater Guneshli F-02 AIOC 31 March 2008
North Deepwater Guneshli F-01Z AIOC 1 July 2008
Deepwater Guneshli F-03 AIOC 29 September 2008
Deepwater Guneshli H-01 / H-01Z / H-01Y AIOC 04 Mart 2009
Deepwater Guneshli H-04 AIOC 15 May 2009
Deepwater Guneshli H-02 AIOC 10 July 2009
Deepwater Guneshli F-04 AIOC 25 December 2009
Deepwater Guneshli H-03 AIOC 22 Mart 2010
Deepwater Guneshli F-06 AIOC 05 July 2010
Deepwater Guneshli H03 AIOC 22 Mart 2010
Deepwater Guneshli F06 AIOC 22 July 2010
COP J01 AIOC 22 September 2010
Deepwater Guneshli G04 AIOC 02 December 2010
Deepwater Guneshli AIOC 17 August 2011
COP J07 AIOC 8 May 2012
COP BATCH DRILLING (J02;J03;J04;J05; J06; J08; J09) AIOC 31 October 2012
COP J13 AIOC 23 November 2012
Deepwater Guneshli H06 / H07 AIOC 9 March 2014
Deepwater Guneshli H08 AIOC 23 April 2014
Deepwater Guneshli J14 AIOC 6 May 2015
Deepwater Guneshli J12 AIOC 5 June 2015
Deepwater Guneshli FO5 AIOC 27 August 2015
Deepwater Guneshli FO7 AIOC 29 October 2015
Deepwater Guneshli G05 / G06 AIOC 09 July 2016
Deepwater Guneshli G07 AIOC March 2017
Karabakh field KPS-4 Equinor May 2020
Zhenis field V-1 Zhenis April 2023